Scope is written down before the walls come down

Four documents leave the studio before demolition starts: the measured survey, the client brief, the concept with layout options, and the decision sheet you sign. Each one is dated, numbered and kept in the project folder for the Kyiv apartment.

What leaves the studio

  1. Measured survey

    Laser measurement of every room, ceiling height, window opening and riser. We photograph the shafts, mark load-bearing walls and record what the previous renovation left behind. Questions about structure go to an engineer, not to a guess.

  2. Client brief

    Who lives there, how the kitchen is actually used, where the pram, bicycle and boiler go, and the budget bracket in UAH per square metre. Exclusions sit in the same paragraph as the number.

  3. Concept and layout options

    Two or three plan variants with furniture outlines, daylight direction and circulation widths. We mark which walls move, which stay and which need consent from the building administration.

  4. Decision sheet

    One page, one column per choice: floor finish, wall finish, joinery fronts, plumbing fittings. Every line names the substitute, what changed and the price effect, so the material ledger stays honest later.

Hidden conditions behind walls, screed and old wiring are found during the survey and priced as a separate line once measured.

03

Drawing package

Each sheet below is issued as a PDF set scaled 1:50 unless noted, plus a DWG working file for the contractor. This set is what builders price from, so nothing gets agreed verbally on site.

  1. A-01

    Demolition plan

    What comes out, what stays, and which load-bearing walls are off limits. Waste volumes are listed for the removal quote.

  2. A-02

    Partition plan

    New walls with thickness, block type and stud spacing, so the build matches the agreed layout.

  3. E-01

    Electrical plan

    Circuits, socket and switch heights, lighting groups and a load schedule. Every point is numbered for sign-off.

  4. P-01

    Plumbing and drainage

    Riser connections, pipe routes, falls and ventilation, worked around the parts of the layout that cannot move.

  5. T-01

    Tiling layout

    Setting-out with grout lines, cut positions and trim details, so you see where a full tile actually lands.

  6. C-01

    Ceiling plan

    Levels, coves, recessed lighting and access hatches for ducts and shut-off valves.

  7. J-01

    Joinery

    Wardrobes, kitchen and vanity units drawn to the millimetre, with fronts, hinges and handle positions.

  8. A-05

    Elevations and sections

    Wall-by-wall views fixing heights, material joints and how finishes meet at every corner.

Hidden conditions behind walls and under screed turn up during the survey. When they change scope, they are issued as a numbered revision to the same set, and the cost effect is written into the material ledger.

Request a sample sheet set

Stage by stage, closed only when you approve it

A renovation is a sequence of stages, not one long open-ended job. Each stage is opened against the drawing package, run by one named site manager, and closed with a written approval before the next crew steps onto the site.

  1. 01

    Demolition and site protection

    Protected routes, dust barriers and a locked storage corner are set up first. The site manager photographs existing conditions before anything is removed.

  2. 02

    Wet works and hidden services

    Electrical runs, plumbing and levelling are installed, then inspected with you present. Conditions found behind old walls are logged here and priced before the work continues.

  3. 03

    Surfaces and finishes

    Plaster, screed, tiling and painting follow the finish specification. Any substitution is written into the material ledger with the reason and the price effect.

  4. 04

    Joinery, fixtures and handover

    Kitchen, wardrobes and sanitary ware are fitted, then the snag list is compiled during a walkthrough and closed item by item before the final payment.

Weekly progress notes
Sent every Friday: what was completed, what comes next, and what changed in the ledger.
Stage-gate approval
No stage starts until the previous one is signed off against the drawings and the cost range.
Snag list
Open items are tracked until they close, and handover photos are attached to each one.

Want to see how a stage gate works in practice? Ask for a short call, or read the drawing package first.

05 / Written estimate

Scope, materials and cost range in one written document.

Send the apartment address, the rooms you want to renovate and any drawings you already hold. You receive a written estimate with the scope list, the material ledger and a cost range per square metre, with exclusions stated line by line. Nothing is ordered and no work is scheduled before you approve that document.